Loading...
Diva (E), Thane, Maharashtra- 400612
Mon - Sat : 10.00 AM - 06.00 PM
safety & policies

Our Safety Policy

Safety is the Utmost Priority in all Our Sisters and Strict Adherence to the Safety Policy is Maintained

Personal Safety Items Likes - Helmets, Safety Belts and Safety Shoes are Mandotory at Site

Site Office & the Site Stores are Equipped With Fire Prevention and the House Keeping Of the Same is Well Maintained

All the Worked are Covered With ESIC Benefits

Ledger is Maintained at Site to Follow the issue of the Safety Items to Workers and Wearing Of the Same is Strictly Maintained at Site With Penalty Clause

Safety Requirements For Electrical Work

Personal Protective Equipment

  • 1) All Necessary Personal Safety Equipment Like :- Safety Helmet, Safety Shoes, Socket etc. are made available.
  • 2) Work Personal Shunting Between inside & Outside any Shift or Floor Edges Should Use Safety harness.
  • 3) These Engaged in Welding and Cutting Works are Provided With Protective Face and Eye-Shieds and Leather Gloves etc.
  • 4) No Smoking Within the Site Premisers / Campus.

Electric Cabling Work inside the Lift Shift

  • 1) Full Body Safety Harness With Double Lanyard (Scaffolohook Type) Provided and Securety Anchored.

Internal Electric Work

  • 1) For Conducting Work Of Celling Level, Provision of Proper Platform / Trestle Ladder.

Vertical Putting Of Electric Cable Through Shaft

  • 1) During Vertical Cable Putting, Cable Putting From Top Down Level is Prohibited.

Flat Testing

  • 1) During Flot Testing, Switch Off Electrical Supply & Test With the Help of Socket Tester and MultiMeter.
  • 2) Use Insulated Hand Gloves & Foot Protection. Work Under Supervision of Experience Electrical License Hold.

Excuvation Work

  • 1) Use of insulated Hand tools and insulated Safety Personal Protective Equipments.

Electric Conduct Zaary Work

  • 1) Use of Protective Googles, Ear Protective Ear Plugs etc.
  • 2) When Cutting or Drilling into Wall or Celling, Proper Precautions Should be taken for Existing Electrical Wiring and Other Hidden Utilities.
  • 3) All Waste, Debris Generated During Chipping Shall be Collection and Disposed Daily.

Work of Height inside the Electric duct at Elevated Level

  • 1) Adequate Lighting Should be Provided Throughout the Working Period Inside the Electric Plumbing Shaft.
  • 2) Safety Harness Should be of Double lanyard Type While Working Near Unprotected Shaft Opening, Floor Edges Use of Safety Harness and Security Anchoring Hook in Firm Support.

Use of Power Operated Hand Tools

  • 1) Before Taken into Use, Check All Electric Operated Tools. Use Only Good Condition Tools.
  • 2) Ensure Safety Guards of Power Tools.
  • 3) Property insulated Cable Joints.
  • 4) Use of Pin Top Plugs.
  • 5) Proper Routing Of Electric Cables, Cable Should not Run Through Staircase Access, Public Movement Area at Avoid Tripping Hazard.
  • 6) Provision of Proper Extension Board For Work Locations Away From TEDB.

Temborory Electric Distribution / Installation For Constribution Work Activities

  • 1) All Times Will be Switched Off Before Carrying Out any Connection Or Repair Work “Lock & TAG OUT” etc.